46273 REL 23: 2003-039-00 EXP NOAA-MONITOR REPRO IN WENAT/TUC/KAL |
|
* Expenditures data includes accruals and are based on data through 31-Mar-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Roy Beaty | Bonneville Power Administration | Yes | F&W Approver | rebeaty@bpa.gov | (503) 230-5213 |
Joseph Connor | Bonneville Power Administration | Yes | COR | jwconnor@bpa.gov | (503) 230-3172 |
Israel Duran | Bonneville Power Administration | Yes | Env. Compliance Lead | induran@bpa.gov | (503) 230-3967 |
Michael Ford | National Oceanic and Atmospheric Administration | Yes | Contract Manager | mike.ford@noaa.gov | (206) 860-5612 |
Andrew Murdoch | Washington Department of Fish and Wildlife (WDFW) | Yes | Technical Contact | andrew.murdoch@dfw.wa.gov | (509) 664-3148x15 |
Mary Nolting | National Oceanic and Atmospheric Administration | No | Administrative Contact | mary.nolting@noaa.gov | (206) 860-3232 |
John Stein | National Oceanic and Atmospheric Administration | No | Supervisor | john.e.stein@noaa.gov | |
Kristi Van Leuven | Bonneville Power Administration | Yes | Contracting Officer | kjvleuven@bpa.gov | (503) 230-3605 |
A | 98449 | 165 | Produce Environmental Compliance Documentation | Verify proper Environmental Compliance is in place | BPA working with the sponsor will make sure the proper environmental compliance is in place and that activities requiring environmental clearance may proceed | $0 | 0.00% | 04/01/2012 | 04/02/2012 |
B | 98450 | 119 | Manage and Administer Projects | Manage and Administer Projects | Administrative work in support of on the ground efforts and in support of BPA's programmatic requirements such as metric reporting, financial reporting, and development of SOW package (includes draft SOW, budget, and property inventory) | $10,000 | 5.35% | 05/01/2012 | 03/31/2013 |
C | 98451 | 162 | Analyze/Interpret Data | Project oversight of DNA collection and analysis | Supervise and manage collection of microsatellite or SNP genotypes | $10,000 | 5.35% | 04/02/2012 | 03/28/2013 |
D | 98452 | 157 | Collect/Generate/Validate Field and Lab Data | DNA data collection | For all adult and smolt samples, we will extract DNA using standard methods and determine genotypes at 12-18 highly variable microsatellite loci or 96 SNP loci. All samples will be processed at the Northwest Fisheries Science Center, Seattle. Subcontractor assistance with this WE. | $143,355 | 76.63% | 04/01/2012 | 03/28/2013 |
E | 98453 | 162 | Analyze/Interpret Data | Analyze and interpret genetic data | Conduct genetic analysis to estimate the relative fitness of naturally spawning hatchery and natural fish and to describe patterns of genetic variation in Wenatchee River spring Chinook salmon | $14,724 | 7.87% | 04/01/2012 | 03/28/2013 |
F | 98448 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $0 | 0.00% | 07/01/2012 | 03/31/2013 |
G | 98454 | 132 | Produce Progress (Annual) Report | Produce 2011 Annual Report (WDFW and NMFS Collaboration) | Produce 2011 annual report (combined effort by WDFW and NOAA) Report will be submitted to WDFW to fulfill deliverable. WDFW will submit and upload report. The annual report will be covered under WDFW's CR-214062. | $9,000 | 4.81% | 05/01/2012 | 09/01/2012 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance requirements in place and completed. | A: 165. Verify proper Environmental Compliance is in place | 04/02/2012 | 04/02/2012 | |
Project managed and administered | B: 119. Manage and Administer Projects | 03/31/2013 | 03/29/2013 | |
Data collected | C: 162. Project oversight of DNA collection and analysis | 03/28/2013 | 03/28/2013 | |
DNA and genotypes data collected | D: 157. DNA data collection | 03/28/2013 | 03/28/2013 | |
Analyzed genetic data | E: 162. Analyze and interpret genetic data | 03/28/2013 | 03/28/2013 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Verify proper Environmental Compliance is in place | 04/01/2012 | ||||||
B | 119 | Manage and Administer Projects | 04/01/2012 | ||||||
C | 162 | Project oversight of DNA collection and analysis | 04/01/2012 | ||||||
D | 157 | DNA data collection | 04/01/2012 | ||||||
E | 162 | Analyze and interpret genetic data | 04/01/2012 | ||||||
F | 185 | Periodic Status Reports for BPA | 04/01/2012 | ||||||
G | 132 | Produce 2011 Annual Report (WDFW and NMFS Collaboration) | 04/01/2012 |